Display Tender COGC010646
This page displays the details of a tender. See the detailed help in each section for specific information.
Contacts
- Craig Taylor
- CTAYLORS@goldcoast.qld.gov.au
The Principal wishes to appoint a suitably qualified and resourced Contractor for the design, demolition, supply, delivery and installation for the upgrade of five bridges located across five Sites.
These Works will include the design, demolition, supply, delivery and installation of composite fibre/ recycled materials bearers, joists, posts, piers, decking, kick rails, all required fixings, all transitional boardwalk to path requirements and all ancillary Works for the bridge’s completion at each Site:
- Site One: Kerrydale Oval bridge renewal.
- Site Two: Schuster Park Broadwalk renewal.
- Site Three: Marlay Park path structure renewal.
- Site Four: The Village Park bridge renewal
- Site Five: Varsity Lakes Wetlands path structure renewal.
-
INVITATION TO OFFER
- Version 1 (13/01/2021)
- Available by Download
-
CONDITIONS OF OFFER
- Version 1 (13/01/2021)
- Available by Download
-
CONDITIONS OF CONTRACT AS4300-1995 - ORIGINAL WITH TRACKED CHANGES
- Version 1 (13/01/2021)
- Available by Download
-
CONDITIONS OF CONTRACT AS4300-1995 AMENDED
- Version 1 (13/01/2021)
- Available by Download
-
RESPONSE FORMS - NON-PRICE SUBMISSION
- Version 1 (13/01/2021)
- Available by Download
-
RESPONSE FORMS - PRICE SUBMISSION
- Version 1 (13/01/2021)
- Available by Download
-
RESPONSE FORMS - CONTRACT HEADER AS4300
- Version 1 (13/01/2021)
- Available by Download
-
PRINCIPALS PROJECT REQUIREMENTS - AS4300
- Version 1 (13/01/2021)
- Available by Download
-
ATTACHMENT A- SITE 1-5 ACCESS AND SITE PHOTOS
- Version 1 (13/01/2021)
- Available by Download
-
ATTACHMENT B- DAF MARINE PLANTS
- Version 1 (13/01/2021)
- Available by Download
-
ATTACHMENT C- OPERATIONAL WATERWAY BARRIER WORKS
- Version 1 (13/01/2021)
- Available by Download
-
ATTACHMENT D- BOARDWALK TRANSITION DETAIL
- Version 1 (13/01/2021)
- Available by Download
-
ATTACHMENT E - CONCRETE PATHWAY CONSTRUCTION DETAIL
- Version 1 (13/01/2021)
- Available by Download
-
ATTACHMENT F- KERB AND CHANNEL DETAILS
- Version 1 (13/01/2021)
- Available by Download
-
ATTACHMENT G- SUPPLEMENTARY TO FORM 1 PLUMBING AND DRAINAGE
- Version 1 (13/01/2021)
- Available by Download
-
ATTACHMENT H- GEOTECHNICAL REPORTS
- Version 1 (13/01/2021)
- Available by Download
-
ATTACHMENT I- TURF SPECIFICATION
- Version 1 (13/01/2021)
- Available by Download
Forum posts cannot be posted after 5 February 2021 11:00 AM
The online forum provides a place to comment and obtain further clarification if needed.
In order to submit or comment on a post you must be logged-in and have downloaded the documents.
Comments cannot be posted after 5 February 2021 11:00 AM.
Please note that the use of the forum for supplier self-promotion is unacceptable and may result in the supplier having their account suspended. Such posts shall not be responded to or published on the forum.
We reserve the right to invite Tenderers to change their tenders as per Section 228(7) of the Local Government Regulation 2012