Poletti Bridge Replacement - Saltwater Creek
Issued By Douglas Shire Council
Request for Tender
Tender State
Closed
Tender Code
DSC008881
Contract Number
2019-077
Opening Date
11 June 2019 02:00 PM
Closing Date
2 July 2019 02:00 PM
Category
Structures and Building and Construction and Manufacturing Components and Supplies - (33%)
Road bridge - (33%)
Bridge construction and repair service - (34%)
Region(s)
South East Queensland
South West Queensland
Central Queensland
North Queensland
Far North Queensland
Darwin

Contacts 

Description 

This development comprises the removal of the existing Poletti Road bridge over Saltwater Creek with a new, single span concrete deck bridge.  The abutments of the new bridge and pier locations have been designed to key into the natural bank and bed surface of Saltwater Creek without intrusion into the creek flow, and will provide improved habitat connectivity with the removal of the instream old bridge piers. 

The bridge replacement over Saltwater Creek is within a public road reserve (Poletti Road) managed by Douglas Shire Council that provides the only road access tor residences and properties. 

The project is a direct replacement of the existing bridge on Poletti Road over Saltwater Creek on the same alignment as the existing bridge.  There are no alternative viable routes that do not require waterway barrier works.

Provision has been made in the design of the temporary sidetrack to allow fish passage.  The sidetrack includes 7 culverts of a minimum 750mm diameter will enable passage for all fish guilds known to utilise the creek. 

The contractor will be responsible for the full removal of the sidetrack and all sediment control devices.  The bed of Saltwater Creek will be formed to the pre-construction state included reinstatement of any removed bed material (if undertaken).  No structures will remain in the water post construction and full fish movement will be reinstated. 

A water quality monitoring program will be established during the construction period to ensure that water quality objectives for the maintenance of habitat conditions conducive to sustaining the health and condition of fisheries resources.

The contractor will be responsible for the full reinstatement of the bed and banks of the creek to their original profile, including reinstatement of any removed bed material (if undertaken).  No structures will remain in the water post construction and full fish movement will be reinstated. 

 

 

Online Tender Forum 

Forum posts cannot be posted after 2 July 2019 02:00 PM

The online forum provides a place to comment and obtain further clarification if needed.
In order to submit or comment on a post you must be logged-in and have downloaded the documents.
Comments cannot be posted after 2 July 2019 02:00 PM.

  Link To Forum

Please note that the use of the forum for supplier self-promotion is unacceptable and may result in the supplier having their account suspended. Such posts shall not be responded to or published on the forum.



We reserve the right to invite Tenderers to change their tenders as per Section 228(7) of the Local Government Regulation 2012